GB50475-2008石油化工全厂性仓库及堆场设计规范(英文版)
图书信息
| 作者 | 中华人民共和国住房和城乡建设部 |
| 出版社 | 中国计划出版社 |
| ISBN | 9787518208197 |
| 出版时间 | 2019-03-01 |
| 字数 | 14.3万 |
| 分类 | 科技,工业技术,其他 |
读书简介
本规范共分11章7个附录,主要内容包括:总则,术语,仓库及堆场类型,总平面及竖向布置,仓储工艺,储存天数,建筑设计,堆场,控制与管理,仓储机械,安全与环保等。本规范适用于石油化工企业固体物料、桶装(瓶装)液体物料和气体物料的全厂性仓库及堆场的新建、扩建和改建工程的设计。
目录
书名页
版权页
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms
3 Classification of Warehouses and Laydown Areas
4 General Layout and Vertical Arrangement
4.1 General Requirements
4.2 General Layout
4.3 Road
4.4 Railroad
4.5 Jetty
4.6 Belt Conveyor
4.7 Fence and Entrance/Exit
4.8 Greening
4.9 Vertical Arrangement
5 Storage Process
5.1 Barreled and Bagged Material Warehouse
5.2 Metallic Material and Spare Part Warehouse
5.3 Bulk Materials Warehouse
5.4 Reinforced Concrete Silos
5.5 Operating Shifts
6 Period of Storage
6.1 General Requirements
6.2 Finished Products and Raw(Fuel)Materials
6.3 Chemicals and Hazardous Substances
6.4 Metallic Materials and Spare Parts
7 Architectural Design
7.1 General Requirements
7.2 Doors and Windows
7.3 Ground
7.4 Heating and Ventilation
8 Laydown Areas
8.1 General Requirements
8.2 Calculation of Laydown Area
8.3 Gantry Grabbing Crane Laydown Area
8.4 Bridge Grabbing Crane Laydown Area
8.5 Bucket-Wheel Stacker/Reclaimer Laydown Area
9 Control and Management
9.1 General Requirements
9.2 Control
9.3 Management
10 Storage Machinery
10.1 General Requirements
10.2 Selection of Major Storage Machinery
11 Safety and Environmental Protection
11.1 Firefighting
11.2 Safety
11.3 Occupational Health
11.4 Environmental Protection
11.5 Emergency Rescue
Appendix A Starting and Ending Point for Spacing Calculation
Appendix B Calculation of Warehouse Area
Appendix C Calculation of Forklift Aisle Width
Appendix D Calculation of Bulk materials Warehouse Storage Volume and Area
Appendix E Period of Storage
Appendix F Bulk materials Laydown Area Storage Volume and Area Calculation
Appendix G Number of Loading/Unloading Machinery
Explanation of Wording in This Code
Explanation of Provisions
1 General Provisions
2 Terms
3 Classification of Warehouses and Laydown Areas
4 General Layout and Vertical Arrangement
4.1 General Requirements
4.2 General Layout
4.3 Road
4.4 Railroad
4.5 Jetty
4.6 Belt Convey
4.7 Fence and Entrance/Exit
4.8 Greening
4.9 Vertical Arrangement
5 Storage Process
5.1 Barreled and Bagged Material Warehouse
5.3 Bulk Materials Warehouse
5.4 Reinforced Concrete Silos
5.5 Operating Shifts
6 Period of Storage
7 Architectural Design
7.1 General Requirements
7.2 Doors and Windows
7.3 Ground
7.4 Heating and Ventilation
8 Laydown Areas
8.1 General Requirements
8.2 Calculation of Laydown Area
9 Control and Management
9.1 General Requirements
9.3 Management
10 Storage Machinery
10.2 Selection of Major Storage Machinery
11 Safety and Environmental Protection
11.1 Firefighting
11.2 Safety
11.3 Occupational Health
11.4 Environmental Protection
11.5 Emergency Rescue
- 新手学Dreamweaver CS6+Flash CS6+Photoshop CS6网页设计(实例版)(全彩)(含DVD光盘1张)(鼎翰文化)
- 纸上王国(邓安庆)
- 姚明(1)(读书堂)
- Castle Rackrent(Maria Edgeworth)
- Once Upon a Christmas (Mills & Boon Love Inspired)(Pamela Tracy)
- 《新东方英语》中学生2014年12月号(《新东方英语》编辑部)
- 第11集 趋势定位:如何从消费市场往创业市场和资本市场转型(此商品为视频课程)(周导)
- 365夜亲子共读:写给男孩子的经典智慧故事全集(秦茵)
