GB50377-2006选矿机械设备工程安装验收规范(英文版)

图书信息

作者中国冶金建设协会
出版社中国计划出版社
ISBN9787518202997
出版时间2015-12-01
字数6.8万
分类科技,工业技术,其他

读书简介

责编本规范是根据建设部建标[2005]124号文《"关于印发"2005年工程建设国家标准制定、修订计划"的通知》的要求,由中国三冶集团有限公司会同有关单位共同编制完成的。本规范在编制过程中,编制组进行了广泛的调查研究,认真总结了我国近20年来选矿机械设备工程及验收等方面的经验,广泛征求了有关单位和专家的意见,对规范条文反复讨论修改,后经审查定稿。

目录

书名页

版权页

Announcement of the Ministry of Construction of the People's Republic of China

Foreword

1 General Provisions

2 Basic Requirement

3 Equipment Foundation,Anchor Bolt and Base Plate

3.1 General Requirement

3.2 Equipment Foundation

3.3 Anchor Bolts

3.4 Base Plate

4 Equipment and Material Approach

4.1 General Requirement

4.2 Equipment

4.3 Material

5 Feeding and Ore Drawing Equipment

5.1 General Requirement

5.2 Installation of Tramcar Dumper

5.3 Installation of Plate-Type Feeder

5.4 Installation of Electromagnetic Vibration Feeder

5.5 Installation of Disk Feeder

5.6 Installation of Chute Feeder

5.7 Installation of Chain And Pendulum Feeders

5.8 Installation of Ore Drawing Gate

5.9 Test Run of Feeding and Ore Drawing Equipment

6 Crushing,Grinding and Sieving Equipment

6.1 General Requirement

6.2 Installation of Jaw Crusher

6.3 Installation of Cycle Crusher

6.4 Installation of Taper Crusher

6.5 Installation of Ore Mill

6.6 Installation of Vibration Sieve

6.7 Test Run of Crushing,Grinding and Sieving Equipment

7 Classifying and Sorting Equipment

7.1 General Requirement

7.2 Installation of Spiral Classifier

7.3 Installation of Hydrocyclone

7.4 Installation of Fine Sieve

7.5 Installation of Barrel-Type Magnetic Separator

7.6 Installation of Turn Cage Magnetic Separator

7.7 Installation of Ring-Type Magnetic Separator

7.8 Installation of Magnetic Dewatering Tank

7.9 Installation of Flotator

7.10 Installation of Jigger

7.11 Installation of Swing Bed

7.12 Installation of Centrifugal Concentrator

7.13 Installation of Heavy-Medium Vibratory Chute

7.14 Installation of Spiral Concentrator

7.15 Test Run of Classifying and Sorting Equipment

8 Dewatering Equipment

8.1 General Requirement

8.2 Installation of Center Drive-Type Concentrator

8.3 Installation of Circum Drive-Type Concentrator

8.4 Installation of Feeding Chute Frame of Concentrator

8.5 Installation of Tube Internal Filtering Vacuum Filter

8.6 Installation of External Filtering Vacuum Filter

8.7 Test Run of Dewatering Equipment

Appendix A Quality Acceptance Record Table for Constituent Works of Mineral Processing Equipment Installation

Appendix B Quality Acceptance Record Table for Divisional Works of Mineral Processing Equipment Installation

Appendix C Quality Acceptance Record Table for Mineral Processing Equipment Installation Works

Appendix D Mineral Processing Equipment No-Load Test Run Record Table

Appendix E Appearance Quality Acceptance Record for Unit Works

Explanation of Wording in This Code

Explanations of Provisions

1 General Provisions

2 Basic Requirement

3 Equipment Foundation,Anchor Bolt and Base Plate

3.1 General Requirement

3.2 Equipment Foundation

3.3 Anchor Bolts

4 Equipment and Material Approach

4.1 General Requirement

4.2 Equipment

4.3 Materials

6 Crushing,Grinding and Sieving Equipment

6.2 Installation of Jaw Crusher

6.3 Installation of Taper Crusher